Skip to main content
Change-of-Use Assembly Space — 11675 Glenoaks Blvd, Pacoima
PROJECT 09  ·  Change-of-Use / A-3 Assembly  ·  11675 N Glenoaks Blvd, Pacoima, CA 91331

Change-of-Use Assembly Space — 11675 Glenoaks Blvd, Pacoima

Certificate of Occupancy Issued
Professional Endorsement
“I have worked with DWD Builders on numerous church projects throughout California since 2012. DWD provided a clear schedule, coordinated with the project team in obtaining permits, and communicated well with the project team throughout the construction process. DWD provides quality work within the budget provided by the owner.”

David M. Johnson

Principal, David M. Johnson Architectural Corporation

Building Area

23,932 Sq Ft

Occupancy

A-3 Assembly

Sanctuary Floor

65’ × 87’ Sloped

Project Status

C of O Issued

Project Overview

This project didn't start with an empty lot — it started with an existing grocery market building that needed to be fully re-engineered to function, structurally and legally, as a nearly 24,000-square-foot assembly occupancy. DWD Builders carried this project from the original change-of-use permit through a supplemental permit for further interior revisions, to a final, issued Certificate of Occupancy.

The Challenge

Converting an existing retail or Mercantile-occupancy building to an A-3 Assembly use under the California Building Code is one of the most code-intensive project types in commercial construction. This building required a full structural re-evaluation, upgraded fire and life-safety systems, revised egress and exit calculations, and comprehensive ADA accessibility compliance — while the existing structure, originally built for grocery retail, provided no head start on any of those requirements. The change-of-use process required changing the building's construction type to Type V-B, installing an automatic fire sprinkler system as a direct permit condition, and re-engineering the structural system to support an assembly occupancy of nearly 24,000 square feet. A supplemental permit for further interior revisions added a second full permit track — requiring DWD Builders to manage two overlapping permit cycles, each with its own RFI process and inspection schedule, simultaneously.

Our Solution

DWD Builders managed the full project scope from the original change-of-use permit through a supplemental permit for interior revisions, to a final Certificate of Occupancy. Structural re-engineering rebuilt the building's structural system, including demolition of the original concrete slab to pour a new stadium-style sloped sanctuary floor spanning 65 × 87 feet — engineered for ADA-compliant slope ratios and path-of-travel requirements. A cast-in-place baptismal pool was constructed using shotcrete and gunite techniques. A new street-facing architectural facade, entry canopy, and large lobby were delivered as part of the original permit scope. Full life-safety systems — automatic fire sprinkler, fire alarm, Knox Box, seismic gas shut-off — were installed throughout. LADWP 1,000-amp main switchboard coordination and fault-current verification were completed. A full AV and sound system was integrated throughout the sanctuary. Age-segmented classrooms, staff offices, and support spaces were built out for full congregation use. The project was carried through more than 54 numbered RFIs and over 38 documented project meetings before a final, issued Certificate of Occupancy.

Key Outcomes

Existing grocery market building fully re-engineered and converted to A-3 Assembly occupancy — construction type changed to Type V-B, carried through to final Certificate of Occupancy

Original concrete slab demolished and rebuilt as an ADA-compliant stadium-style sloped sanctuary floor spanning 65 × 87 feet — engineered for accessible sightlines from every seat

Cast-in-place baptismal pool constructed using shotcrete and gunite techniques — engineered as a permanent, waterproofed, structurally reinforced concrete feature

New street-facing architectural facade, entry canopy, and large open lobby built as part of the original change-of-use permit scope

Full life-safety systems installed — automatic fire sprinkler system, fire alarm, Knox Box, and seismic gas shut-off — all required as direct permit conditions

LADWP 1,000-amp main switchboard coordinated, fault-current verified, and electrical service released — full AV and sound system integrated throughout the sanctuary

54+ RFIs and 38+ project meetings managed to a final Certificate of Occupancy across two simultaneous permit tracks

Have a project like this in mind?

Free consultation — no commitment, just an honest conversation about your build.

Project Gallery
Exterior — Building & Parking
Exterior — Building & Parking
Sanctuary — Lobby Entrance Doors
Sanctuary — Lobby Entrance Doors
Sanctuary — Seating & Wood Wainscot
Sanctuary — Seating & Wood Wainscot
Lobby — Column Corridor
Lobby — Column Corridor
Lobby — Exit Corridor
Lobby — Exit Corridor
Lobby — ADA Water Fountains
Lobby — ADA Water Fountains
Sunday School — Classroom 112
Sunday School — Classroom 112
Start Your Build

We build projects like this every day.

Schedule a free consultation with our team. We'll review your plans, walk the site, and give you an honest assessment — no pressure, no obligation.

Sanctuary — Interior Construction
Sanctuary — Interior Construction
Sanctuary — Floor Installation
Sanctuary — Floor Installation
DWD Team — Site Walk
DWD Team — Site Walk
DWD Team — Structural Inspection
DWD Team — Structural Inspection
Sanctuary — Slab Excavation
Sanctuary — Slab Excavation
Sanctuary — Framing & Rebar Grid
Sanctuary — Framing & Rebar Grid

Project Specifications

23,932
Sq Ft
Building Area
A-3
Assembly
Occupancy
Type V-B
Construction
Type
54+
RFIs
Managed
C of O
Issued
Status
Project Details
Location: 11675 N Glenoaks Blvd, Pacoima, CA 91331
Change of Use — Grocery Market (M) to Church / Assembly (A-3)
Zoning: C2-1 Commercial · Single Floor
Architect of Record: David Michael Johnson, Lic. C18045
Structural Engineer of Record: Margarito Castillo, Lic. S4808
General Contractor: DWD Builders Inc., CSLB B-991385
Permits & Approvals
Change-of-Use Permit: 12014-10000-00088
Supplemental Interior Revisions: 12014-10004-00088
Fire Sprinkler System — Required as Direct Permit Condition
LADWP Electrical — 1,000-Amp Main Switchboard
Special Inspections: Structural Steel, Welding, Epoxy, Concrete
Full CBC, Green Code, HVAC, Plumbing & Public Works Sign-offs
Full Scope

Scope of Work — Change of Use to Assembly Occupancy

A nearly 24,000-square-foot building, two permit tracks, 54+ RFIs, and 38+ project meetings — carried from original change-of-use permit to final Certificate of Occupancy.

Structural & Building Envelope
Full structural re-engineering of existing building for A-3 assembly occupancy — construction type changed to Type V-B
Special inspections for structural steel, field welding, and epoxy bolts throughout
Complete interior framing and structural concrete work throughout the facility
New architectural facade at the front of the building
New entry canopy — original change-of-use permit scope
Large open lobby entrance designed for full congregation access and circulation
Storage mezzanine converted to accessible office space with new ramp under supplemental permit
Sanctuary Floor & Baptismal Pool
Demolition of existing concrete slab — full reconstruction as ADA-compliant stadium-style sloped sanctuary floor spanning 65 × 87 feet
Graduated concrete pour engineered for accessible slope ratios — improved sightlines from every seat to the altar and stage
Structural concrete re-engineering tied into the building's existing foundation and framing
Cast-in-place baptismal pool — shotcrete and gunite construction common to swimming pool engineering
Special inspections for concrete strength and waterproofing throughout the pool assembly
Life Safety & Fire Protection
Automatic fire sprinkler system installed throughout the entire building — required as a direct change-of-use permit condition
Full fire alarm system design and submittal
Fire department Knox Box installation
Seismic gas shut-off valve installation
Roof drain design corrections resolved through the RFI process
Full Building, Electrical, Green Code, HVAC, Plumbing, and Public Works clearance sign-offs
Electrical & Mechanical
Full LADWP electrical service coordination — 1,000-amp main switchboard, fault-current verification and release
LED lighting design — canopy, wall sconce, and interior applications
Full AV and sound system installation throughout the sanctuary
HVAC duct cleaning and full air balance testing prior to occupancy
Expansion tank and water heater sizing for building mechanical systems
Dedicated electrical circuits for baptismal pool equipment
Sanctuary Interior Finishes
Wood wainscot paneling throughout sanctuary walls
Fire-rated leather-upholstered seating throughout the sanctuary
Ceiling system revisions coordinated with the architect of record
Non-slip flooring inspection and clearance
Education, Support & ADA Compliance
Age-segmented classrooms for nursery, children's, and youth ministry programs
Additional meeting rooms for congregation and staff functions
Staff break rooms
ADA-compliant restroom partitions and accessories throughout
New accessible ramp added under supplemental permit
Multi-round punch list management through final closeout
Service Area

Church Construction Across Los Angeles and Beyond

Although this project is located in Pacoima in the San Fernando Valley, DWD Builders provides church construction, change-of-use conversion, and assembly facility renovation to congregations across Los Angeles County, Southern California, and nationally. We navigate A-3 Assembly occupancy requirements, ADA compliance, LADBS permitting, and the local regulatory environment each jurisdiction demands.

Common Questions

Change-of-Use Assembly Construction — Frequently Asked Questions

What does a change-of-use permit from retail to assembly require in Los Angeles?

Converting an existing retail or Mercantile-occupancy building to an Assembly (A-3) occupancy under the California Building Code requires a full structural re-evaluation, upgraded fire and life-safety systems, revised egress and exit calculations, and ADA accessibility compliance. In this project, that included changing the building's construction type designation to Type V-B and installing an automatic fire sprinkler system throughout as a direct condition of the permit.

What structural work is required to convert a commercial building into a church or assembly space?

Structural re-engineering typically includes special inspections for structural steel, field welding, epoxy bolts, and concrete strength verification. On this project, DWD Builders coordinated full structural framing and concrete work, including demolition of the original slab to pour a new ADA-compliant sloped sanctuary floor spanning 65 × 87 feet.

Can a baptismal pool be built as a permanent structural feature in a commercial church building?

Yes. A cast-in-place baptismal pool can be built using shotcrete and gunite techniques common to swimming pool construction, engineered as a permanent, waterproofed, structurally reinforced concrete feature. Because it involves standing water and specialized plumbing, it is typically reviewed and inspected as its own distinct scope of work within the broader permit.

What ADA requirements apply to a sloped sanctuary floor?

A sloped or stadium-style sanctuary floor must meet accessible slope ratios and path-of-travel requirements so that every seating area, including accessible seating, has a clear sightline and a compliant means of access. On this project, the sloped floor spanned 65 feet by 87 feet and was engineered and inspected to meet those standards.

What is Occupancy Group A-3 under the California Building Code?

Assembly Group A-3 covers spaces used for worship, recreation, and similar assembly purposes without significant fixed seating arrangements typical of theaters or arenas. It carries specific requirements for occupant load calculations, egress width, and fire protection that differ significantly from Mercantile or Business occupancy classifications.

How is a change-of-use project like this managed from permit to final occupancy?

A conversion of this scope is typically managed through a formal RFI (Request for Information) process, documented project meetings, and structured submittal review across structural, electrical, life-safety, and finish packages. This project was carried through more than 54 numbered RFIs and over 38 documented project meetings before reaching a final, issued Certificate of Occupancy.

Let's Build Something Exceptional

Your Project Could Be Next

Contact our team for a free consultation. We'll review your plans, walk the site, and give you an honest assessment — no pressure, no obligation.

Back to Full Portfolio

Licensed CA General Contractor · CSLB Lic. #B-991385 · Encino, CA

Call Now
Begin Project