Ross’s 115,000-SF DTLA Lease: 7 Questions Before You Sign for Your Next Office
A major office lease is a useful reminder: the square footage on a listing is only the beginning. Review seven build-out questions before committing to your next LA office.
A promising office can look ready for your business long before its construction scope is understood. Ceiling heights, meeting rooms, power, ventilation, accessibility and landlord obligations all shape what the space can become. A recent Downtown Los Angeles lease provides a timely starting point for a pre-lease conversation that smaller office users need just as much as large tenants.
By DWD Builders Editorial Team · Published · Updated October 19, 2026 · 6 min read
DWD Builders Intel weekly brief: October 19–25, 2026. Sources checked October 19, 2026.
The recent news: Ross signs a large ROW DTLA office lease
Connect CRE reported on October 16, 2026 that Ross Stores signed an approximately 115,000-square-foot lease at ROW DTLA for its West Coast merchandising hub. The report describes approximately 110,000 square feet of creative office space and 5,000 square feet of exclusive rooftop space.
That reporting establishes the lease and its stated space program. It does not provide a tenant-improvement budget, construction schedule or technical design package. The seven questions below are planning guidance for your own office search, rather than a description of Ross’s construction work.
Sources: [1]
Key takeaways
- Confirm the permitted use and physical constraints before pricing your desired layout.
- Separate landlord work, tenant improvements and owner-supplied equipment.
- Use written drawings and assumptions to compare construction proposals.
1. Does the space fit the way your business will operate?
Start with people, equipment and daily activities. Identify meeting rooms, quiet rooms, storage, collaboration areas, technology needs and any specialized functions. Ask your architect and the relevant authorities what approvals apply to that intended use; a real-estate label such as “creative office” is not a complete regulatory analysis.
Document your priorities before falling in love with a floor plan. A generous open area may still need substantial coordination to become a comfortable, functional office with the right circulation and support spaces.
2. What do the existing conditions actually support?
Request available record drawings and coordinate an appropriate site review. Ask about structural constraints, ceiling services, plumbing locations, electrical capacity and the condition of existing equipment. A drawing from a previous fit-out may be useful background without being an accurate record of today’s conditions.
Identify which assumptions require further investigation. A preliminary construction allowance should state those assumptions rather than silently treating unknown existing conditions as included and resolved.
3. Will the mechanical and electrical systems serve the new layout?
Enclosing meeting rooms, increasing equipment loads or changing how a space is used can introduce system-design questions. Have the appropriate designers review the layout, expected occupancy, ventilation, power and controls together. Ask who owns or maintains any shared building systems.
Avoid the shortcut of assuming that an existing operating office requires only finishes. The relevant issue is whether the proposed work and intended use fit the existing infrastructure and the project’s applicable requirements.
4. If outdoor or rooftop space is included, what use is approved?
The ROW report’s rooftop component is a useful reminder to look beyond a marketing amenity. For your own property, confirm what outdoor use is authorized and ask the design team about access, loads, guards, waterproofing and any proposed equipment or furniture.
An attractive roof is not automatically ready for every gathering or installation. Review the landlord’s rules and the authority’s requirements before treating a terrace as an unrestricted extension of the office program.
Sources: [1]
5. Who pays for each part of the improvement?
Review the lease and work letter with qualified advisers. Separate landlord-delivered conditions, tenant-funded work, allowances, reimbursements and owner-purchased items. Identify any deadlines or approval requirements affecting reimbursement.
Then compare that allocation with the proposed construction scope. A tenant-improvement allowance is a funding provision, not proof that all necessary work is covered. The budget should reflect the actual drawings, specifications and identified responsibilities.
6. What must happen before you can move in?
Map landlord approval, design completion, agency review, material procurement, construction, inspections and any applicable occupancy steps. Coordinate business-side tasks such as technology setup and furniture installation with that sequence.
Ask for the dependencies behind a schedule, not just a single duration. If drawings are incomplete or a delivery is unconfirmed, the plan should make that uncertainty visible before your old lease expiration becomes the only date driving decisions.
7. Are you comparing the same construction package?
CSLB advises consumers to check contractor information, references and written bids. For an office project, compare proposals against the same current design documents. Ask for clear exclusions, allowances, change procedures and responsibility for permits or owner-supplied equipment.
The useful next step is a defined scope, not a square-foot guess copied from an unrelated corporate lease. A smaller office may have very different systems, existing conditions and finish expectations from the project that made the news.
Sources: [2]
Your pre-lease office build-out checklist
- Write a room program and equipment list.
- Collect available drawings and existing-condition information.
- Review use, accessibility, systems and outdoor-space questions with the design team.
- Clarify landlord work, tenant work and allowance conditions.
- Identify approval, procurement and move-in dependencies before agreeing to dates.
Frequently asked questions
Does the Ross lease tell me what my office build-out will cost?
No. The cited report provides lease and space information, not a construction-cost benchmark. Your scope, existing conditions, specifications and responsibilities require their own review.
Should a contractor review the space before I sign a lease?
Early construction input can help identify scope and existing-condition questions. Coordinate that input with your architect, landlord and legal advisers rather than treating it as a substitute for their approvals or advice.
Can I spend a tenant-improvement allowance however I choose?
Do not assume so. Your lease and work letter determine eligible work, approvals and reimbursement conditions. Have qualified advisers review those documents before committing the allowance.
Sources
Sources checked October 19, 2026.
- [1]Connect CRE: Ross Stores Leases 115K SF for West Coast Merchandising Hub, October 16, 2026 (opens in new tab)
Reports the approximate lease size, creative-office and rooftop components, and intended merchandising-hub use. Does not disclose a construction budget or delivery date.
- [2]California CSLB: Finding the Right Licensed Contractor (opens in new tab)
Established consumer guidance on contractor selection, license checks, references and written bids; not a new October 2026 rule.
Plan your commercial project
Explore DWD Builders’ commercial construction services
Review the service options for your own commercial property, then discuss the scope, drawings, approvals and delivery requirements with DWD Builders.
Explore commercial construction servicesContinue planning
Before you sign, understand the office you need to build
Send DWD Builders your proposed office location, available drawings, intended use and timing priorities. Discuss tenant-improvement construction and the scope questions to resolve next.